SORRI
ENGINEERING

Back to Projects

AICS Jerusalem — HVAC Works

MEP Coordination & HVAC Systems

AICS Jerusalem — HVAC Works 0

Location

Sheikh Jarrah, Jerusalem

Area

960m²

Type

Institutional / Commercial

Role

MEP Coordination & Project Management

Architect

—

Year2025
ClientAICS — Agenzia Italiana per la Cooperazione allo Sviluppo

Project Description

MEP coordination and HVAC systems management for the AICS Jerusalem headquarters in Sheikh Jarrah. Works include the full supply, installation, testing, and commissioning of a VRF air conditioning system with a 130kW outdoor unit, 31 indoor cassette and concealed ducted units across multiple floors, heat recovery units, galvanized ductwork with rock wool insulation, condensate drainage, fresh air and exhaust distribution, and a dedicated split unit for the server room. The scope also covers underground VRF copper piping, air distribution outlets and grilles, volume control dampers, and the trade-in of all existing HVAC units. Works are carried out in accordance with ASHRAE, SMACNA, and AICS technical specifications.

Scope

Supply, installation, testing and commissioning of a full VRF HVAC system including outdoor unit, indoor units, heat recovery, ductwork, drainage, fresh air and exhaust distribution, and server room split unit

View in Projects Map

Architectural Plans

Plan 1

1 / 3

Thumbnail 1
Thumbnail 2
Thumbnail 3

Planning a similar project?

We'd be happy to guide you from the planning stage through to project delivery.

Book a Consultation